Evaluation of Capacity of Constructing Solar Power Plants in Water and Wastewater Plants in MARKAZI Province and its Role in Energy Crisis

Document Type : Original Article

Authors
1 Department of Water Science and Engineering, Faculty of Agriculture and Environment, Arak University, Arak, Iran
2 Manager of Water Control and Energy Systems Office, Markazi Province Water and Wastewater Company, Arak, Iran
Abstract
The necessity of reduction in the emission of polluting gases and to preserve water resources are of the issues that highlight the importance of providing an approach for replacing fossil fuel power plants by renewable power plants. In this study, the capacity of the water and wastewater plants of the MARKAZI Province in constructing solar power plants was examined and analyzed in terms of contributing to the energy crisis of this province. In this regard, first, information on electricity consumption, area, geographical coordinates and characteristics of the area around all construction sites owned by the water and wastewater company was collected; then, by applying some environmental constraints, a total of 62 suitable construction sites with a total nominal power of 80 MW were determined. The power plants corresponding to these construction sites were designed using the PVsyst software, and the total annual production capacity and carbon emission reduction were obtained by this software. Next, three scenarios of the current situation, constructing 50 percent and constructing 100 percent of the existing capacity in the Water and Wastewater Company by the year 2030 were considered. Since the Shazand Thermal Power Plant is the main electricity producer in the province, the results were examined in each scenario from the perspective of environmental indicators such as corresponding fuel consumption and the amount of reduction in carbon dioxide emissions in this power plant. The results indicated the positive effect of implementing the second and third scenarios in reducing the fuel consumption of the Shazand Thermal Power Plant by 31 and 63 percent, respectively, compared to the current situation scenario. In addition, in terms of reduction in carbon emissions, the results indicated the carbon dioxide emissions reduced by 17 and 36 percent, respectively, in the second and third scenarios compared to the current situation.
Keywords

[1] Shahsavari A. Yousefi H., Shahorn, Israfil. The contribution of solar energy in the world energy portfolio in 2030, Scientific Journal of Renewable and New Energies. 2018; 5(2).
[2] Moradian R. Moridi Farimani F. Renewable Energy Development in Iran - Choice or Necessity? Journal of Renewable and New Energies. 2012; 9(2).
[3] Abbasi-Goudarzi A. Maleki A. Policymaking of the Islamic Republic of Iran in the exploitation of renewable energy resources, Quarterly Journal of Strategic Studies in Public Policy. 2017; 7(23).
[4] Anonymous. Identification of potential sites in the country, investigation of renewable energy sources, prioritization and determination of the share of clean energies, Ministry of Energy, Office of Potential Assessment and Evaluation of SATBA. 2021.
[5] Anonymous. Report on the amount of water saved in the electricity generation process in solar power plants compared to fossil power plants, Ministry of Energy, Office of Economic, Technical and Environmental Assessments. 2021.
[6] Anonymous. Introduction to the Office and Performance Report 1399, Ministry of Power, Renewable Energy and Electricity Efficiency Organization (SATBA), Office of Potential Assessment and Evaluation of Renewable Energy. 2021.
[7] Ghasemi S. M. Strategic Management of Drinking Water, Niaz Danesh Publications, First Edition. 2016.  
[8] Issapour A. Abedi S. Investigating water consumption in thermal power plants and providing solutions for improving consumption patterns. Seventh Conference on Power Plants. 2014.
[9] Guo Z. Sun Y. Pan S. Y. Chiang P. C. Integration of Green Energy and Advanced Energy-Efficient Technologies for Municipal Wastewater Treatment Plants. International Journal of Environmental Research and Public Health. 2019; 16(7):1282. https://doi.org/10.3390/ijerph16071282.
[10] Mekonnen M. M. Gerbens-Leenes P. W. and Hoekstra A. Y. Future electricity: The challenge of reducing both carbon and water footprint. Science of the Total Environment. 2016; 569–570, pp. 1282–1288. https://doi.org/10.1016/j.scitotenv.2016.06.204.
[11] Asdrubali F. Baldinelli G. D’Alessandro F. and Scrucca F. Life cycle assessment of electricity production from renewable energies: Review and results harmonization. Renewable and Sustainable Energy Reviews. 2015; 42:  1113–1122. https://doi.org/10.1016/j.rser.2014.10.082. 
[12] Nabavi S. Mostafazadeh R. Asiahir R. Analysis of water scarcity indicators and water governance network in the sixth five-year development plan of Iran, Iranian Journal of Irrigation and Water Engineering. 2021; 12: 2. [in Persian]
[13] Talebian A. Ghandehariun S. Hosseinalipour S. M. Dadpoor A. Life cycle assessment of polycrystalline solar panel production in Iran, Journal od solar energy Research. 2020; 5(3): 516-526.
[14] Sotnyk I. Wenjuan D. Chortok Y. Yevdokymov A. & Yang Y. Enhancing Efficiency and Sustainability: Green Energy Solutions for Water Supply Companies. Економіка розвитку систем. 2024; 6(2):53-62. https://doi.org/10.32782/2707-8019/2024-2-8.
[15] Arjomand A. and Takhar S. Simulation of a floating solar power plant on a wastewater treatment pond Case study: Wastewater treatment plant No. 1 Shiraz, Journal of Energy Policy and Planning Research. 2023; 8(4): 2. URL: http://epprjournal.ir/article-1-1107-fa.html.
[16] Hamlehdar M. Yousefi H. Noorollahi Y. Fahimi-Henzaei R. Utilizing the potential of the water and wastewater industry for distributed clean energy production. Journal of Ecohydrology. 2018;  5(4): 1147-1160. doi: 10.22059/ije.2018.257602.878
[17] Emami Meybodi A. Amadeh H. Comparison of technical efficiency and bioefficiency in selected thermal power plants in Iran, Journal of Energy Policy and Planning Research. 2017; 3(8):33-67.

  • Receive Date 15 November 2025
  • Revise Date 06 December 2025
  • Accept Date 10 December 2025